Outer Diameter Measurement of Floor Heating and Air Conditioning Hoses

  • Plastic & Rubber (Automotive, Building Materials, Industrial)
  • Installations

Overview

The outer diameter of floor heating and air conditioning hoses is controlled continuously, and a marking unit flags defective sections for downstream processes.

The Challenge

Pipe and hoses used in home equipment are required to meet higher quality assurance standards year by year.

Our Solution

An outer diameter gauge installed on the production line controls the outer diameter continuously. In some cases it is combined with a marking unit that marks defective sections.

Key Point

Beyond detection, we can also propose a system that passes defect positions on to downstream processes.

Products used

Similar Cases

Have a question?
Our team is ready to help.

Contact

Tel. +81-42-645-8920

Hours: 9:00–17:30 JST, Monday–Friday (excluding Japanese public holidays)

General Inquiries

Contact

Contact us about products, quotations, or documentation.

Contact Us Contact Us

Request a Quote

Quotation

Tell us about your application, and we will prepare a quotation.

Request a Quote

Brochures & Manuals

Download

Find the information you need to select and evaluate our products.

Download